top of page

With Studio Gliozzi (since February 2018)

Principal and owner of Architectural and Design Studio for k-12, residential, and commercial projects in Portland, Oregon.

With Bassetti Architects (December 2016 – February 2018)

Senior Project Architect and Designer responsible for the programming, design of two High Schools in Tigard Tualatin School District

  •     TIGARD HIGH SCHOOL – Programming, SD, and DD of 150,000 SF school remodel – Tigard, OR.

  •     TUALATIN HIGH SCHOOL – Programming of school expansion – Tualatin, OR.

With Ankrom Moisan Architects (April 2015 – November 2016)

Senior  Project Architect responsible for the successful completion of residential buildings

  • SEATTLE UNIVERSITY - Student Housing for Capstone Development Partners – Seattle, WA.

  • 427 W 5th – High rise apartments building for MacFarlane Partners – Los Angeles, CA.

  • 437 S Hill  – Mid rise apartments building for MacFarlane Partners – Los Angeles, CA.

 

With Jacobs Engineering (from May 2011 – April 2015)

Project Architect and Designer responsible for the programming, design and construction documents and administration for clean rooms in semiconductor and research facilities.

  • UNIVERSITY OF CHICAGO – William Eckhart Research Center - Chicago, IL - High-performance research facility.

  • PRINCETON UNIVERSITY – Andlinger Center - Princeton, NJ - Sustainable energy research facility.

  • INTEL - RONLER ACRES CAMPUS - Hillsboro, OR - Remodeling of an existing semiconductor chip facility.

  • WACKER CHEMIE AG  – Charleston, Tennessee (2011) Architectural Lead  for the schematic design, detail design, bidding and construction documents for a 40,000 SF Fire Station in a new poly-silicon production facility.

With McMillan Pazdan Smith Architecture (from July 2006 – Jan. 2010)

Project Architect and Designer responsible for the programming, design and construction administration of educational facilities.

  • DISTRICT FIVE PERFORMING ARTS CENTER - Duncan, SC. Auditorium for 1,000 seats and band rehearsal room for 200 musicians in the facilities of Byrnes High School.

  • ABNER CREEK ELIMENTARY SCHOOL - Duncan, SC. New elementary school.

  • LYMAN ELIMENTARY SCHOOL - Lyman, South Carolina. New elementary school.

With CH2M Hill (from July 1996 – July 2006)

Project Designer and Architectural Lead responsible for master planning, design and construction administration of several industrial, commercial and institutional facilities.

  • ROCHE CAROLINA INC. – Florence, SC - Addition of a Centrifuge and Dryer in an existing Launch Area.

  • PFIZER – Terre Haute, IN - Expansion and remodeling of an existing penicillin filling and packaging facility.

  • PHARMACIA – Kalamazoo, MI - Expansion of the packaging, milling and micronizing area.

  • AIRBUS - EADS CASA – Seville – Spain -  International competition for the A400M Military Aircraft Assembly Facility  in Seville Spain. Joint venture between Master Ingenieria and Lockwood Greene.

  • HOME DEPOT – Buenos Aires – Argentina - New store located in Moreno, Buenos Aires.

  • U.S. EMBASSY –Lima – Peru  - Addition of a high security office building.

  • C&A STORES – Argentina - Two new retail stores in Buenos Aires and Mendoza, Argentina

  • PROCTER & GAMBLE CO. - Moscow, Russia - Master planning of Paper,  Beauty and Food production facilities.

  • PEPSI INTERNATIONAL BOTTLERS – Russia - Bottling plants in Moscow, Samara and Yekaterinburg.

  • COLGATE-PALMOLIVE CO. - Moscow, Russia - Preliminary design of a new toothpaste production facility.

bottom of page